Soil And Water Conservation Measures

Soil Conservation Measures:
During the year 2001-02, 270 numbers of minor engineering structures
like Gully Plugs, Small Check Dams, Medium Check dams, Gabions, Bandharas etc. were constructed. During the year 2002-03, the number of structures constructed were Gully Plugs (77 Nos), Small Check Dams(286 Nos), Medium Check dams(10 Nos), Gabbions ( 6 Nos). During the year 2003-04, the number of structures constructed were Gully Pluggings 2 Nos, Small Check Dams 100 Nos, and dry stone dams 142 Nos.